About the client
The client provides water collection, treatment and reuse services and runs its projects in Jira. It engaged FiftyFive to automate the reporting layer around that Jira environment while keeping full ownership of the environment and its project operations.
Management reports that were out of date before the meeting
- Exported by hand. Project- and issue-level data was exported from Jira by hand each cycle.
- Separate manual steps. Consolidation, analysis and PowerPoint preparation were separate manual steps, with no single place where reporting logic lived.
- Reports drifted. Jira and the reports drifted apart between cycles; by review time, project state had usually moved on.
- Hard to compare. The same metrics were presented differently from cycle to cycle, so reports were hard to compare.
- No governed place. Preparation and distribution depended on team availability, and stakeholders had no single, governed place to see the current position.
What FiftyFive built
A two-person FiftyFive team (a project manager and a Power BI developer) designed one automated pipeline running from Jira through to stakeholder access, replacing manually prepared decks with a single interactive Power BI report. The client retained ownership of its Jira environment and project operations throughout.
How the solution works
Ingestion
- The Jira REST API feeds project- and issue-level records directly from the system of record, removing manual exports and intermediate spreadsheets.
Transformation
- Power Query extracts, transforms and prepares the data.
- The logic is defined once and reapplied on every refresh, so records reach the model in a consistent, report-ready shape.
Data model and visuals
- A central Power BI data model provides one governed definition of project data for all management views.
- Custom visuals built with Deneb match the client's reporting requirements and keep presentation identical between cycles.
Publishing and distribution
- The report is published to a Microsoft Fabric workspace for central hosting and distributed to authorised stakeholders through a Power BI App, so reviewers explore the report directly instead of requesting new slides.
Technology stack
What the solution enabled
Business transformation
Manual stages replaced by one workflow
Engagement ongoing, report in use
Interactive Power BI report replacing decks
Four manual stages consolidated
Extraction, consolidation, analysis and PowerPoint preparation replaced by one automated Power BI workflow.
Automated Jira ingestion
No manual data pulls in the reporting cycle.
One distribution point
Authorised stakeholders open a single Power BI App instead of receiving recurring decks.
Central hosting
One Microsoft Fabric workspace for the report.
FiftyFive Technologies built an automated project reporting pipeline for a water and wastewater services provider whose management reports were assembled by hand from Jira exports and PowerPoint every cycle. FiftyFive integrated the Jira REST API, shaped the data in Power Query, built a central Power BI data model with custom Deneb visuals, and published the report to a Microsoft Fabric workspace distributed through a Power BI App. Four manual stages (extraction, consolidation, analysis and slide preparation) were replaced by one automated workflow.
Technical questions
How does the Jira data reach the Power BI report?
The Jira REST API feeds project- and issue-level records directly from the system of record, removing manual exports and intermediate spreadsheets. Power Query extracts, transforms and prepares the data.
How is the report distributed to stakeholders?
The report is published to a Microsoft Fabric workspace for central hosting and distributed to authorised stakeholders through a Power BI App, so reviewers explore the report directly instead of requesting new slides.